
Up extremely early and was in the summer house with Mix by six o’clock, moving boxes and sorting books. I took Olive to the railway station at 6.30 and was back in the summer house less than an hour later, working through until I stopped for my breakfast at nine (having walked Mix down to the bridge in between times).
Ate a quick breakfast and retired to the summer house, bringing in new books and removing old ones (which will find a place in the library in the Hen House in due course). Tom arrived and we went across to the barn and all but emptied it by lunch time – it will be a gentle task to complete tomorrow. While Tom was home for lunch I enjoyed a cheese and bean pie in the summer house while I watched the climax of a superb T20 match between South Africa and New Zealand (South Africa won but right up until the very last ball it could have gone either way).
In the afternoon I worked through the summer house and by the end of the afternoon. while not complete, it was at least tidy and fit for use.

Mix and I went for a walk to the bridge in the late afternoon. There is now a canopy over one of the gantries – there was bright sunshine today but I suspect that it is more about the rain which is forecast for later in the week.

Work is obviously progressing on the bridge as well:

Back at Mount Pleasant, I put the gas oven on for the casserole and then went back to complete the tidy-up of the summer house. We dined at seven and then I watched University Challenge, recording Silk as I had to go off to Berwick to collect Olive from her train. On my return Rachel and I watched Rev which had also been recorded, after which we walked the dogs and retired to bed. We have made progress.
[ view entry ] ( 2498 views ) | permalink